Note4Students
From UPSC perspective, the following things are important :
Prelims level: Mekedatu Project
Mains level: Cauvery Water Dispute
The National Green Tribunal (NGT), Southern Zone has appointed a joint committee to look into allegations of unauthorized construction activity taking place in Mekedatu, where the Karnataka government had proposed to construct a dam across the Cauvery River.
What is the Mekedatu Project?
- Mekedatu, meaning goat’s leap, is a deep gorge situated at the confluence of the rivers Cauvery and Arkavathi, about 100 km from Bengaluru, at the Kanakapura taluk in Karnataka’s Ramanagara district.
- In 2013, then Karnataka announced the construction of a multi-purpose balancing reservoir project.
- The project aimed to alleviate the drinking water problems of Bengaluru and Ramanagara district.
- It was also expected to generate hydro-electricity to meet the power needs of the state.
Issues with the project
- Soon after the project was announced TN has objected over granting of permission or environmental clearance.
- Explaining the potential for damage to the lower riparian state of TN, it said that the project was in violation of the final award of the Cauvery Water Disputes Tribunal.
- It stated that the project will affect the natural flow of the river Cauvery considerably and will severely affect the irrigation in TN.
Get an IAS/IPS ranker as your 1: 1 personal mentor for UPSC 2024