Note4Students
From UPSC perspective, the following things are important :
Prelims level: Indus River Systems
Mains level: Indus Water Treaty and its significance
India has refused a request by Pakistan to hold a meeting on issues around the Indus Water Treaty (IWT) at the Attari check post near the India-Pakistan border.
The IWT has been in existence since 1960, and reached a flash point in the aftermath of the Uri attacks in 2016 with PM declaring that “blood and water couldn’t flow together”.
About Indus Waters Treaty, 1960
- The IWT is a water-distribution treaty between India and Pakistan, brokered by the World Bank signed in Karachi in 1960.
- According to this agreement, control over the water flowing in three “eastern” rivers of India — the Beas, the Ravi and the Sutlej was given to India
- The control over the water flowing in three “western” rivers of India — the Indus, the Chenab and the Jhelum was given to Pakistan
- The treaty allowed India to use western rivers water for limited irrigation use and unrestricted use for power generation, domestic, industrial and non-consumptive uses such as navigation, floating of property, fish culture, etc. while laying down precise regulations for India to build projects
- India has also been given the right to generate hydroelectricity through the run of the river (RoR) projects on the Western Rivers which, subject to specific criteria for design and operation is unrestricted.
Talks stalled on key projects
- Among the key points on the table was evolving a procedure to solve differences on technical aspects governing the construction of the Ratle run-of-the-river (RoR) project on the Chenab in the Kishtwar district.
- India has called for the appointment of a ‘neutral’ party while Pakistan favours a Court of Arbitration to agree upon a final resolution on the design parameters of this hydropower project.
- According to the IWT, India has the right to build RoR projects on the three ‘western’ rivers — the Chenab, Jhelum and Indus — provided it does so without substantially impeding water flow in Pakistan downstream.
- Pakistan believes that the project’s current design does pose a serious impediment and has told the World Bank that it wants a Court of Arbitration (CoA) set up to decide on the issue.
- India says this is only a technical issue and mutually solvable.
Get an IAS/IPS ranker as your 1: 1 personal mentor for UPSC 2024