Note4Students
From UPSC perspective, the following things are important :
Prelims level: Model Solar Village
Why in the news?
- The Ministry of New and Renewable Energy has issued operational guidelines for the Implementation of ‘Model Solar Village’ under PM-Surya Ghar Muft Bijli Yojana.
- The centre recently allocated ₹800 crore for the same.
About PM Surya Ghar Muft Bijli Yojana
Description | |||||||||||||
Purpose | To provide 300 units of free electricity per month to beneficiaries through an investment of ₹75,000 crores. | ||||||||||||
Deadline | Extended the deadline from 2022 to 2026. | ||||||||||||
Announcement | Initially announced in an Interim Budget 2024-25 speech by the Finance Minister. | ||||||||||||
Target | Aimed to light up 1 crore households. | ||||||||||||
Implementation | Urban Local Bodies and Panchayats are incentivised to promote rooftop solar systems. | ||||||||||||
Financial Support |
|
Features of the ‘Model Solar Village’ Initiative:
Details | |
Comprehensive Solarization |
|
Implementing Agency | State Renewable Energy Development Agency (SREDA) or another entity nominated by the State/UT Government will implement the scheme. |
24×7 Solar-Powered Village | Develop villages powered entirely by solar energy, promoting self-reliance in meeting energy needs. |
Central Financial Assistance (CFA) |
|
Eligibility Criteria |
|
Fund Disbursement | 40% on the award of works, 40% after completion, 20% after 6 months of operation. |
PYQ:[2018] With reference to solar power production in India, consider the following statements: 1. India is the third largest in the world in the manufacture of silicon wafers used in photovoltaic units. 2. The solar power tariffs are determined by the Solar Energy Corporation of India. Which of the statements given above is/are correct? (a) 1 only (b) 2 only (c) Both 1 and 2 (d) Neither 1 nor 2 |
Get an IAS/IPS ranker as your 1: 1 personal mentor for UPSC 2024